Two-storey riverside residence in Baghdad Iraq with a full-height stick curtain wall facing a palm garden toward the river and a perforated screen wall on the street side
Villas & Private Residences · Baghdad, Iraq

Baghdad Riverside Residence

A private family residence on the Tigris riverfront in Baghdad — a full-width glazed garden elevation that had to survive 50 °C summers, dust-storm seasons and a privacy-minded streetscape, while giving the family an unobstructed view over the water.

Reference study Middle East New build
Representative study imagery
Location Baghdad, Iraq
Year 2024
Envelope 860 m² envelope
Building 2 storeys
Programme 16 weeks ex-works
Scope Design & Supply + installation supervision
01 · Project brief

The building question behind the facade.

A private family residence on the Tigris riverfront in Baghdad — a full-width glazed garden elevation that had to survive 50 °C summers, dust-storm seasons and a privacy-minded streetscape, while giving the family an unobstructed view over the water.

02 · The story

How the envelope was resolved.

Each chapter records a decision the next project team can evaluate: intent, performance, production and site delivery.

01

Intent and facade brief

The brief read like a contradiction: maximum transparency toward the river, maximum privacy toward the street, and a facade maintainable by a local crew that had never before glazed a structural joint. We resolved it as a split elevation — a full-height stick curtain wall facing the garden and river, with a deeply recessed, perforated screen wall holding the street frontage.

02

System and climate response

Baghdad's climate drove every specification decision. Double-silver low-E laminated units cut solar gain through the west-facing river elevation; framing and pressings were PVDF-coated for dust-abrasion resistance; and every horizontal joint was detailed for pressure-equalised drainage against the short, violent winter storms.

03

Fabrication and coordination

Fabrication ran in our plant under staged QA photography, and the consignment was packed in installation sequence so the site crew could work bay by bay without sorting material. Our installation engineer then spent two weeks on site — setting out the first grid, training the crew on sealant and dead-load adjustment, and signing off the first eight panels.

04

Installation and handover

The residence completed with the client's crew installing the remaining panels under remote support, on a one-working-day answer commitment that held through the entire erection season. Technical documentation went to the local authority; final approval remained with the client's accredited third-party engineer.

03 · System & scope

Stick Curtain Wall

Design & Supply + installation supervision

Facade area
860 m² envelope
Programme
16 weeks ex-works
Building scale
2 storeys
Explore this facade system

Middle East context: solar exposure, dust, drainage, finish durability and local review responsibilities are coordinated project by project.

04 · Responsibilities

Who did what.

Client Private family
Architect Local architecture practice
Main contractor Local general contractor
Facade engineering Starveil Facade
Installation Client's crew, supervised start-up by our engineer
05 · Study outcomes

What the reference study is designed to test.

  • 01

    860 m² envelope delivered design-supply with two weeks of on-site supervision (T2)

  • 02

    Supervised start-up model: the client's crew installed the balance of panels independently

  • 03

    Dust-season maintenance regime documented, with walkway-level access to every glazed joint

  • 04

    Local third-party review completed from the submitted technical evidence package

Discuss a similar facade scope.

Share the project location, drawings or photographs and intended installation route. We will frame the first technical questions within 48 hours.

Get a Project Review
WhatsApp