Completed institutional facade renovation integrating retained masonry with a new high-performance curtain wall
System 04 · For what exists

Facade Renovation & Retrofit Systems

Bay-by-bay upgrades for tired shopfronts and aging street elevations — engineered so the shop keeps trading while the street gets its confidence back.

Survey & outcome reference

Read what exists. Then design what comes next.

Existing glazed elevation beside an active construction area during site assessment
Existing-condition reference · licensed real image
Completed contemporary commercial glass facade illuminated at dusk
Completed-facade reference · separate project

These are separate licensed reference photographs, shown to explain the journey from survey to a finished facade. A matched Starveil before-and-after pair will replace them when the original project photography is approved.

How it works

Keep the frame, replace the skin

Most tired facades have sound structure under dead skin. A laser survey confirms what the frame can carry; the smoked glass, the rusted shutter and forty years of signage fixings go — and the replacement is phased bay by bay so the till keeps ringing.

  • Survey first — laser survey of the existing structure before anything is ordered.
  • Climate upgrade in the same pass — glass, coatings, seals and hardware can be reviewed while the elevation is open.
  • Phased around occupation — bay sequence, temporary protection and access are planned before fabrication.
  • Overnight bay swaps — never closed more than one consecutive day.
  • Shutter discipline — internal bulkheads that hide the most ageing element on the street.
  • Modular repeatability — matching bays for your next fit-out, shorter lead time.
The four moves that matter
Move What changes What it does
Open the entrance Oversized pivots or sliding leaves replace the narrow 1970s doorway The invitation, before anything else
Raise the glass Full-height glazing replaces frosted and smoked panes The shop interior becomes its own advertisement
Hide the shutter Internal bulkhead detail Removes the most ageing element on the street
Discipline the signage One fascia zone, clean lighting Credibility, instantly

None of these moves requires rebuilding the shop. All four together change how the street reads the business.

Specifications, translated

The numbers, and what they mean for your business

Parameter Typical specification What it means for you
Programme 3–6 weeks ex-works; days per bay on site The renovation happens around trading, not instead of it.
Trading continuity Phased bay-by-bay overnight swaps Never closed more than one consecutive day in our delivered projects.
Typical budget US$30K–150K per shopfront A business decision with a payback you can actually watch — footfall changes in month one.
Structure reuse Existing portal retained where survey allows Real budget and two programme weeks saved, and less waste to landfill.
Security Concealed shutters, laminated glazing build-ups After-hours protection that doesn't advertise itself in daylight.
Components Sized for hand-carry by a small crew No crane on a narrow street — every piece manhandleable.

Typical values shown for guidance; every renovation is surveyed and quoted on what the existing structure actually allows.

Test evidence for your market
✓ EN 13830 / CE
✓ ASTM E283 · E331
✓ Security glazing build-ups available

Send us the "before" photo.

Photographs of the existing shopfront and a location are enough for an indicative figure — the before-and-after conversation starts there.

Get a Project Review
WhatsApp