FAQ
Straight answers, by the topic.
Cost, programme, payment, freight, certification, installation and regional delivery — the practical questions that shape an international facade project before drawings are approved.
01
Cost & budget
What does a facade typically cost?
Project value depends on facade area, system, glass specification, performance criteria, market and delivery scope. Residential and shopfront ranges can provide an early reference, while public, cultural, commercial and high-rise packages are assessed from drawings and programme; Starveil does not apply a seven-storey or US$3 million capability ceiling. See our full 2026 price guide.
What moves the price most?
Area, glass build-up (triple glazing, laminates, solar coatings), finish (anodising vs. powder coat), geometry complexity, and storey count — which drives installation method more than material.
Will you quote a fixed price?
Yes. Once drawings or clear site photos are in hand, our quotation is fixed for the stated scope, with interfaces and exclusions listed in writing. If a line is not in the quotation, we say so in writing.
02
Lead times & programme
How long from approved drawings to delivery?
Typically 14–20 weeks from shop-drawing approval to ex-works, then two to six weeks of ocean transit depending on destination. A full phase-by-phase timeline is in From Drawings to Container.
What usually delays projects?
In order: approval latency, late design changes, customs paperwork started after shipping, and site readiness (embeds and brackets not verified before the container lands). The fabrication itself is rarely the problem.
Can you compress the programme?
Yes — unitized curtain wall cassettes trade fabrication cost for installation speed, and sequenced containers keep sites clear. Tell us the date that actually matters (crane date, container date, grand opening) and we plan backwards from it.
03
Payment
What is the payment structure?
A staged schedule typical of export manufacturing: deposit with order, milestone payments at engineering approval and fabrication start, balance before shipment. The schedule is stated in the quotation — no surprises mid-project.
What currencies and terms do you accept?
USD is standard; EUR and AUD can be arranged. We quote FOB and CIF per your preference, and the quotation names the incoterms explicitly.
04
Shipping & customs
How is the facade packed?
Containers are packed in build order — bay by bay, level by level — so your crew never digs for the next panel. Every container ships with a full packing manifest keyed to the panel schedule.
Who handles customs?
We prepare the export documentation package; your customs broker handles import clearance. We can introduce experienced brokers in most destination markets on request.
What if something arrives damaged?
Unpack and condition-check within 48 hours of arrival — our packing is designed for it. Transit damage discovered early keeps any claim simple, and our packing strategy includes documented spares so a single gasket never stops a crew.
05
Remote delivery & communication
How does remote engineering support work?
Field questions are answered within one working day, by an engineer who has seen your drawings — not a salesperson reading from a catalogue. Every answer is logged, so the handover file tells the full story.
Can we inspect before shipping?
Yes — video inspections of mock-ups and first completed panels are standard, and your representative is welcome at the plant. Panels are numbered, recorded and photographed before they leave.
What about time zones?
Our engineering desk overlaps business hours across Australasia, Southeast Asia, the Gulf, and European and North American mornings. The one-working-day answer commitment applies regardless of your time zone.
06
Certifications & compliance
Which standards and test evidence can you support?
We map the proposed configuration to the relevant test and engineering framework for the destination market. That may include EN curtain-wall evidence, ASTM air and water test families, AAMA field-testing procedures or other project-specific requirements. The quotation states what applies and what still requires local review. Start with our Certification & Compliance evidence path, then read Certifications That Matter for the detailed explainer.
Do the reports cover my configuration?
The quotation states exactly which tested build-up applies to your glazing, spans and wind loads. If your configuration differs from an existing test, we say so and test or engineer accordingly.
Who handles local approvals?
The quotation states which approvals are included and which sit with your local team — project-specific engineering sign-off by a locally licensed engineer is a common client-side line, and we support the process with full documentation.
For the complete evidence path, regional reference matrix and scope boundary, see Certification & Compliance.
07
Installation options
Do you install?
We offer three levels. T1 — your crew installs with our manuals and remote engineering (standard). T2 — your crew installs with our supervising engineer on site for the critical first weeks (weekly-rate add-on). T3 — our own or partner crews install to completion, assessed case by case. Full comparison in Installation Options.
My crew has never hung a curtain wall. Is that a problem?
Not usually. Our installation packs are written for exactly that situation, and most crews in T2 projects run independently after a supervised first level or first week. Frameless systems get a supervised start as standard practice.
What does the supervising engineer actually do?
Setting-out verification, crew training on the first panels, sealant audits, and a photographed inspection record at handover. Supervision is scoped in writing before it starts — support without takeover.
When would you recommend your own installation (T3)?
Projects remote from any qualified installer, and markets where we hold established installation partners. If your local market has strong glaziers, we will usually tell you T1 or T2 serves you better.
08
Middle East & North America
Can you support projects in the GCC?
Yes. For UAE, Saudi Arabia, Qatar, Bahrain, Oman and Kuwait enquiries, the technical review considers solar exposure, coastal or inland conditions, dust, finish durability, privacy and the local approval route. See our GCC project support page.
How do coastal salt and inland dust change the specification?
They affect coating systems, fastener grades, gasket and sealant selection, drainage paths and maintenance access. The correct response is project-specific, so we ask for the city, distance from the coast, exposure and cleaning strategy before fixing the build-up.
Can you coordinate a North American facade package?
Yes. The design-supply package can be developed around the project’s specified ASTM and AAMA testing requirements, wind criteria, thermal and condensation targets, shipping sequence and installation plan. Local code approval and professional sign-off remain with the appointed local team.
Is an on-site Starveil engineer included?
Not by default. T2 site supervision is a separately priced option for qualified projects, while T3 installation is assessed case by case. Supply-only projects include the agreed installation documentation and remote engineering support.
Do you offer Mashrabiya, BIPV and luminous facade systems?
Yes. These sit within our specialty systems range and are coordinated with the primary curtain-wall grid. The system pages explain when each approach is appropriate and what must be resolved during design.
A question we didn’t answer?
Include the project location and exposure condition in your enquiry so the answer reflects the correct climate and approval context.