Five-storey apartment building with panelized unitized facade cassettes and light snow on the ground
Apartments & Residential · Calgary, Canada

Maple Court

A 5-storey rental building where winter closes the construction window — unitized cassettes compressed the envelope programme to weeks.

Reference study North America New build
Representative study imagery
Location Calgary, Canada
Year 2024
Envelope 1,420 m² envelope
Building 5 storeys
Programme 18 weeks ex-works
Scope Design & Supply
01 · Project brief

The building question behind the facade.

A 5-storey rental building where winter closes the construction window — unitized cassettes compressed the envelope programme to weeks.

02 · The story

How the envelope was resolved.

Each chapter records a decision the next project team can evaluate: intent, performance, production and site delivery.

01

Intent and facade brief

Calgary's season dictated the method. Stick construction would have chased the weather into November; factory-completed compact-unitized cassettes let the crew close the building in before the first hard freeze.

02

System and climate response

Thermal performance drove the cassette design — thermally broken frames, triple glazing on the north elevation, and a condensation-risk analysis for each typical unit type, which the local authority's review passed without comment.

03

Fabrication and coordination

Panels shipped in erection sequence with a container plan keyed to the crane schedule. Every truck was met, unpacked and hung within 48 hours of arrival, so the site never carried storage risk.

04

Installation and handover

Our engineers ran a weekly remote coordination call with the facade crew for the six-week installation window, resolving field questions within one working day — logged, so the handover file tells the full story.

03 · System & scope

Unitized Curtain Wall

Design & Supply

Facade area
1,420 m² envelope
Programme
18 weeks ex-works
Building scale
5 storeys
Explore this facade system
04 · Responsibilities

Who did what.

Client Micro developer
Architect Local architecture practice
Main contractor Regional main contractor
Facade engineering Starveil Facade
Installation Main contractor's facade crew
05 · Study outcomes

What the reference study is designed to test.

  • 01

    Building closed before the first hard freeze — programme protected

  • 02

    Envelope installed in a 6-week window with weekly remote engineering support

  • 03

    Field questions answered within one working day, all logged