01
Intent and facade brief
The brief was to turn a standard concrete-frame commercial shell into a recognisable address on the street. We resolved the elevation as a full-height stick curtain wall — factory-fabricated mullions and transoms, site-glazed with double-silver low-E laminated units, detailed for pressure-equalised drainage against Baghdad's violent but brief winter rain.
02
System and climate response
Climate drove every specification: framing and pressings carried a PVDF coat for dust-abrasion resistance; warm-edge spacers cut condensation risk through the air-conditioning season; and every horizontal head was designed to shed sand rather than trap it.
03
Fabrication and coordination
Because this was a delivered installation, the contract separated supply warranty from installation warranty from the outset. Our project team mobilised with partner crews, set the grid off the structural survey, and sequenced bay-by-bay erection around the tenant-fit-out programme.
04
Installation and handover
The facade handed over on programme. From the street the glazing reads as a single calm plane; behind it, the maintenance team works from a documented panel-by-panel manual — every unit replaceable from inside, without scaffolding.